Seamless Pipe in Pakistan

As the name Seamless pipe in Pakistan, pipes that are formed without welded joints are called seamless pipes, and vice versa, the surface of welded pipes has a vertical weld seam. In Seamless pipe in Pakistan to the construction method, the allowable pressure, cost and use of each type of pipe are also different.

Differences in the cost of seamless pipes and ERW pipes

The production of Seamless pipe in Pakistan requires a long and multi-step process. Therefore, the cost of seamless pipes is always higher than the cost of welded pipes, because ERW pipes use cold sheets and are welded with high frequency welding. This is a relatively simple process and less expensive than a series.

Why use seamless pipes instead of ERW

The use of seamless pipes has two advantages: First, the working pressure of seamless pipes is 20% higher than ERW pipes, because unlike ERW pipes, applying more pressure does not lead to rupture or breakage of the pipe and is a common cause. Another option for Seamless pipe in Pakistan is not to suffer from intergranular corrosion. Unlike seamless pipes, welded pipes are affected by heat or heat. Grain boundaries are affected by susceptibility, which increases intergranular erosion. What weakens the ERW pipe.

Why choose seamless pipes for oil and gas

The use of seamless pipe is suitable for a variety of high pressure applications. In the oil and gas industry, the flow of media through the system puts a lot of force on the pipe. Especially at high temperatures and this strong force with increasing temperature, creates a lot of pressure in the pipe. For seamless pipe, the load carrying capacity of the pipes increases by about 20%, making them suitable for use in the oil and gas industry.

ERW and seamless pipe production process

Welded resistance, also known as ERW for short, can be achieved by cold forming steel plates in a cylinder. After cold forming, an electric current flows between the two ends of the steel. An electric current heats the cold rolled steel to the point that the edges have to be joined. The bond created during this welding process is obtained without the use of fillers. The high frequency ERW process is the most commercial option for producing high quality welds.

Unlike welded pipes, the production of seamless pipes is longer and more compact


This process uses heat and other processes. Several things to create the final product. The unrefined steel is preheated and poured into solid ingots. These solid blocks form cylindrical unrefined alloy steel. In cylindrical shape, the unrefined steel pipe is rolled into a long, hollow product. This newly created product has an irregular center. A bullet-shaped penetration point is attached to the center of a steel rod. Even when the pallet is rolled to create a more uniform surface and a more stable depression shape.

How to define a stainless steel pipe or ERW seamless

Seamless pipe in Pakistan are produced with different specifications, but if ASTM A53 specifications are applied to the design, the pipes become stenciled. If the template represents type S, it has a seamless structural tube. Conversely, if type E is a stencil printed on a tube, show that the structure is a type of resistance electrode weld. Another way to inspect welded pipes is to use a UV control. Under the influence of ultraviolet rays, the particle structure of the tubes significantly affects the weld seam area, because surface operations are currently underway to reduce the number of welds. But pimples can be check by UV scan.

By Crescent Corporation

HVAC companies in Pakistan provides residential and commercial insulation services at Pakistan. Spray polyurethane foam insulation is our pride. And along with other insulation products we can meet your insulation needs for your home, warehouse, store and any building structure.

Leave a Reply